It has been a very busy few months. It feels like we're doing four jobs.
However we have now completed the new framing.
This is the new wall upstairs.
This is a frame to attach the floor boards to. Unfortunately the floor is a native wood which means it is ridiculously expensive.
What is left before building inspection is to attach the lower walls into the concrete floor, some wiring, three doorways, removal of the existing floor upstairs, construction of a half height wall, and construction of some platforms where the stairs change direction (in photo immediately above.
The supplies arrive later this week so along with possible Katya operations, work and this... it is going to be a busy time.
No comments:
Post a Comment